Etoile Phase II
Expanding mining operations at Etoile to meet global green energy demands
Having been mined intermittently since 1907, production from existing oxide resources is nearing completion. Chemaf is advanced in the development of a second plant designed to process mixed and sulphide ores.
A key source of copper and cobalt hydroxide
US$128 million Etoile Processing Plant based on Chemaf’s proven technology.
- Location: Lubumbashi, Katanga, DRC
- Product:Copper cathode and intermediate cobalt hydroxide
- Capacity: 5,000-tpd flotation plant and 400-tpd roasting plant. Designed to produce 25,000 tpa copper cathodes and 4,000 tpa cobalt hydroxide
Mutoshi Project
Mutoshi seals Chemaf’s position as a leading cobalt producer
The Mutoshi development in Kolwezi is at the heart of Chemaf’s ambitious growth plans. Mutoshi is a large-scale copper-cobalt project at an advanced stage of development. This project comprises a fully mechanised open-pit mine and a state-of-the-art integrated proces sing plant with a capacity of 50,000 tpa of LME Grade A copper cathodes and 16,000 tpa of cobalt contained in cobalt hydroxide. Once commissioned, Mutoshi will be Chemaf’s flagship operation, forming the foundation for future growth plans.
Consistently producing high quality copper
16,000 tpa capacity Cobalt content in hydroxide salt
Location: Kolwezi district in the Lualaba province of the DRC
Product: Copper (Cu) and cobalt (Co) ore
Chemaf at Mutoshi
With the initial focus on the North and Northeast Deposit, potential economic copper and cobalt deposits exist in all directions around the Mutoshi Open Pit. The company has completed a preliminary economic assessment, definitive feasibility study and mineral resource estimate for the Mutoshi North and Northeast Deposits. In addition, it has conducted metallurgy, mining study, process design, and environmental and social impact studies. The resource development programme is fully operational after a preliminary economic assessment and definitive feasibility study. Chemaf's 25-year lease over PE2604 gives the company the rights to mine and process the material from the concession. Chemaf has also constructed an automated SX-EW processing plant at Mutoshi that is designed to process a total of 3.9 million tonnes per annum (tpa) of run-of-mine ore. The Mutoshi SX-EW process plant can produce 50,000 tpa of LME Grade A copper and 16,000 tpa of cobalt hydroxide.
- Location: Kolwezi district in the Lualaba province of the DRC
- Product: Copper (Cu) and Cobalt (Co) ore
- Capacity: Capacity: 50,000 tpa LME Grade A copper cathodes and 16,000 tpa cobalt hydroxide
- Resources: A total of 159.62 million tonnes with TCu 0.84% and TCo 0.25% resources available at Mutoshi North and North East Deposits. A total of 159.62 million tonnes with TCu 0.84% and TCo 0.25% resources available at Mutoshi North and North East Deposits.